Skip to main content

300 MW hybrid solar + BESS project reaches financial close in Arizona (US)

A joint venture between BrightNight and Cordelio Power has reached financial close for the Pioneer Clean Energy Center, a 300 MW solar power plant combined with a 300 MW/1.2 GWh BESS project in Yuma, Arizona (United States) (Cordelio Power press release, 04/11/2025). Construction has already started, with an expected start of operations by April 2027.

The hybrid project is expected to provide “reliable, dispatchable energy to support Arizona’s growing electricity needs, fulfilling a long-term tolling agreement with a local utility. 

Power plant tracker

Interested in Power Plants?

Enerdata has developed a market research service to screen, monitor and analyse the development of power generation assets.

Power Plant Tracker offers an interactive database and a powerful search engine covering power plants worldwide – including both installed and planned capacities for renewables and fossil fuels.

Request a free trial Contact us